The old deck was dark and stained, and it came down to the ground before the new one went up.
Leo's crew took the old deck down to the ground and built the new one in pressure-treated pine on the same footprint: square pickets on a top and bottom rail, posts on concrete footings with knee braces at the corners, a stair run along the house wall to a landing and a second run down to a concrete pad in the yard.
- Build
- Leoysa Home Improvements
- Scope
- Deck replacement
- Location
- Douglasville, Georgia




